Pennington Bridge Restoration

Update – Pennington Bridge Phase 2:

With grant funds from the Bureau of Reclamations WaterSMART program, BHWC has hired Great West Engineering and Applied Geomorphology to design a long-term solution involving activation of side channels and bank stabilization. BHWC will be actively engaging landowners in the lower section of the Big Hole and work with Madison County to co-develop a solution for this problem that provides for water reliability, safety to infrastructure and private property, and improve ecological function.

The images below shows the restoration phases identified by Great West Engineering. BHWC and partners will complete these phases as funds become available, starting with Phases 1, 2, and 3.

All Projects
Project 1_Reactivate Relic Channel
Project 2_Bank Armoring
Project 3_New Diversion Structure

Project Description

Due to two county bridges constraining the floodplain and side channels, this section of the lower Big Hole River has accelerated flows which have forced large-scale erosion and bank loss upstream of one bridge.  In 2016, Madison County placed 175 cubic yards of riprap along 205 ft of the bank to protect the Pennington Bridge infrastructure and private ground. The riprap has held but is slowly being flanked by the river.  This flanking, combined with the continual bank loss and erosion, poses a substantial risk  to the Pennington Bridge abutments and infrastructure downstream. BHWC and partners are approaching this issue in two phases.

Phase 1 – Completed Spring 2021

We exceeded our fundraising goal of $1,500 to offset costs of the Pennington Bridge Phase 1 project, thanks to the generous contributions of 12 donors. A huge thank you to everyone who contributed! Total raised: $1,629.55

Phase 1 created a more effective solution to excessive sediment erosion from the crumbling streambank than continual rip-rapping. Removing the point bar activated an adjacent overflow/high flow channel, decreasing shear stress and erosive forces on streambanks. BHWC and partners also planted native riparian vegetation (mechanically transplanted willow clumps and hand-planted stakes/whips) on top of and throughout the existing 2016 rip-rapped bank.


Project Results

Phase 1-Complete

BHWC and partners removed 3,500 cubic yards of sand and gravel from a point-bar just above the bridge to ensure that the river stays underneath the Pennington Bridge while also reducing excessive erosion and sedimentation.

Phase 2-Ongoing

The objective of this project is to design and permit the first three projects identified in the Big Hole River Restoration Plan, which will address ongoing accelerated erosion and deposition happening along the Big Hole River, expanding one-mile upstream of the Burma Rod crossing and approximately one half-mile downstream. The projects include reactivating relic channels to provide flood relief in riparian areas and increase aquatic habitat; stabilizing riverbanks using strategically placed vegetated soil lifts along eroding banks; and constructing a new irrigation diversion and headgate to provide reliable water to irrigators which will eliminate the need to dredge the riverbed every year.

The Big Hole River Restoration Plan was developed by the Big Hole Watershed Committee through the use of a Bureau or Reclamation WaterSmart Grant with match contributions from Madison County.


People and Organizations Involved

Private Landowners

Big Hole Watershed Committee

Madison County

Montana Fish, Wildlife, and Parks

Funders

Montana Watershed Coordination Council

Natural Resources Conservation Service

Bureau of Reclamation

Contractors

Rowe Excavation

Great West Engineering

Applied Geomorphology Incorporated

Geum Environmental Consulting

Project Photos

Eroding bank above Pennington Bridge.
Eroding bank above Pennington Bridge.
Phase 1 project design.
Eroding bank above Pennington Bridge.
Eroding bank above Pennington Bridge.
2016 Riprap and erosive bank (back ground). Point bar to be removed is on the left.
Bank before 2016 riprap.
Bank before 2016 riprap.
Bank after 2016 riprap. This has only provided a temporary patch to the issue.
Migration of the Big Hole and subsequent bank loss from 1995-2012.

Project MAP

Status

In Progress

Type

Native Fish

Explore more

River Conditions Our Projects Get Our Newsletter
Big Hole Watershed Committee

Footer

Big Hole Watershed Committee
P.O. Box 21
Divide, MT 59727-0021
(406) 960-4855

Non-Profit Status
The Big Hole Watershed Committee is a 501(c)3 non-profit organization created to support the communities of the Big Hole River.

Copyright © 2025 · Big Hole Watershed Committee | Website by Luci's Office, Inc. | Privacy Policy | Terms of Use

Keep In Touch

  • Email
  • Facebook
  • Instagram
  • Phone
  • Twitter
  • YouTube

Search